Somerville news blog city forum massachusetts journal newspaper MA

«« Previous: 1/18/12 Somerville Housing Authority 

 Next: Meeting TONIGHT about mayor’s plan to close Davis Square library »» 

1/25/12 Green Line Extension Corridor-Wide Public Meeting

by in All Ages, Beat Reporter, Events, Green Line, Neighborhoods and Squares, Transportation Projects
Posted on January 15, 2012 at 8:01 pm

January 25, 2012
6:00 pmto8:00 pm
GD Star Rating
loading…

Green Line Extension Corridor-Wide Public Meeting

Wed. Jan. 25 6:00 – 8:00 PM

Somerville High School Auditorium
Somerville High School Cafeteria
81 Highland Ave.
Somerville MA (map)

The Massachusetts Department of Transportation (MassDOT) is holding a meeting on Phase 1 of the Green Line Extension, the Early Bridge & Demolition Package. This includes reconstructing and widening rail bridges, relocating track, relocating signals, and noise mitigation.

Agenda includes the early bridge and demolition package, affecting the Medford Street Rail Bridge (Somerville), the Harvard Street Rail Bridge (Medford), and 21 Water Street (Cambridge).

For more information, see Green Line Extension to Somerville Project .

WITI?

GD Star Rating
loading…

Back to Top ↑
No Comments »

«« Previous: 1/18/12 Somerville Housing Authority 

 Next: Meeting TONIGHT about mayor’s plan to close Davis Square library »» 

Leave a Reply

Notify me of followup comments via e-mail. You can also subscribe without commenting.

To comment with your profile, click below to log in.

Spam protection by WP Captcha-Free