Somerville news blog city forum massachusetts journal newspaper MA

«« Previous: 5/9/11 – 6/9/11 Ch. 91 Tideways Comment Period on Assembly Square Orange Line T-Stop (Ref: #W11-3326) 

 Next: FOIA Request- ADA ramps constructed in 2009 »» 

5/26/11 Green Line Extension Project Update Public Meeting

by in All Ages, Beat Reporter, Events, Green Line
Posted on May 15, 2011 at 4:41 pm

May 26, 2011
6:30 pmto8:00 pm
GD Star Rating
loading…

Green Line Extension Project Update Public Meeting

Thurs. May 26 6:30 – 8:00 PM

Tufts University
51 Winthrop St.
Medford MA (map)

This is the regular meeting of the Green Line Extension Design Working Group.

Among other updates, the group will likely review an analysis by MassDOT and the MBTA on the feasibility of incorporating a light rail vehicle support facility into the Boston Engine Terminal.

For more information, see:

WITI?

GD Star Rating
loading…

Back to Top ↑
1 Comment »

«« Previous: 5/9/11 – 6/9/11 Ch. 91 Tideways Comment Period on Assembly Square Orange Line T-Stop (Ref: #W11-3326) 

 Next: FOIA Request- ADA ramps constructed in 2009 »» 

One Response to “5/26/11 Green Line Extension Project Update Public Meeting”

  1. According to STEP, which has membership on the Design Working Group, the main focus of the 5/26/ meeting will instead be a discussion of the updated design concepts for the Washington Street Station.

    I have glanced at the analysis, and was not surprised to note that it argued against extending the Boston Engine Terminal on the basis of cost and capacity.

    GD Star Rating
    loading...

Leave a Reply

Notify me of followup comments via e-mail. You can also subscribe without commenting.

To comment with your profile, click below to log in.