Somerville news blog city forum massachusetts journal newspaper MA

«« Previous: A Call For Greater Transparency At Somerville City Hall 

 Next: News from Somerville Schools »» 

Assembly Square Orange Line Station 30% Progress Design Meeting

by David Dahlbacka in Accessibility, All Ages, Development and Zoning, Environment and Open Space, Events, Neighborhoods and Squares, Special, Transportation, Transportation Projects - Posted on December 28, 2009 at 8:38 am

Jan
12
7:00 pm
GD Star Rating
loading…

Assembly Square Orange Line Station 30% Progress Design Meeting

Tues. Jan. 12 7:00 PM

Cafeteria
Capuano Early Childhood Center
150 Glen St.
Somerville MA (map)

This is the progress report meeting by the MBTA on the design for the Assembly Square Orange Line T-Stop. Present from the MBTA will be staff from the MBTA Development Department, Design & Construction Department, and Operations Department.

At past meetings, citizens spoke strongly in favor of a second head house, or access point, to the T-Stop. This meeting is important because we will hear what, if anything, the MBTA plans to do about the second head house.

For more on these issues, see:

GD Star Rating
loading…
  • Share/Bookmark
Back to Top ↑
No Comments »

«« Previous: A Call For Greater Transparency At Somerville City Hall 

 Next: News from Somerville Schools »» 

Leave a Reply

Anti-Spam Protection by WP-SpamFree